Re-roofing project; Day 3 and 4
August 1 and 2 and moving right along . . .
8/2/05
Yippie!

roof0805001 roof0805002 roof0805003 roof0805004 roof0805005
roof0805001.jpg
Part of guest bedroom has plywood and tar paper. Beginning to lay roofing. Dust from plaster ceiling settling on my bedroom stuff! Cover up everything with sheets.
roof0805002.jpg
Lots of rot here and replacement boards needed. Being prepared off site.
roof0805003.jpg
This was maybe toughest part and rest of roof would go easier. Looks like I need a new paint job . . . [smile]
roof0805004.jpg
Put me right up there with the guys. Wish I could have helped them !!
roof0805005.jpg
Gene said there was none but he would put some there. We can see layers two and three of the roofing.
roof0805006 roof0805007 roof0805008 roof0805009 roof0805010
roof0805006.jpg
Under this part of roof, damage from tree hitting roof and will be repaired.
roof0805007.jpg
For my bedroom dormer. Sheetrock instead of bead boards to cut cost.
roof0805008.jpg
Tree hit here when it fell June 2004. Parts for dormer repair [to rotted out stuff] in driveway -- ready to go.
roof0805009.jpg
One for each side of bedroom dormer.
roof0805010.jpg
Replacement boards for my bedroom dormer.
roof0805011 roof0805012 roof0805013 roof0805014 roof0805015
roof0805011.jpg
Under overhang on my bedroom dormer. Replace with plywood for lower cost. Already some plywood used this way on back of 1895 house overhang.
roof0805012.jpg
Looking out my bedroom window.
roof0805013.jpg
I had a tarp over my bedroom roof for almost two years!! It leaked for years and caused rot. Finally, a good roof over my head!!
roof0805014.jpg
Even more nails to pound down or pull out.
roof0805015.jpg
The chimney served as flu for heat in bedroom once, perhaps. Part of it still remains below roof level.
roof0805016 roof0805017 roof0805018 roof0805019 roof0805020
roof0805016.jpg
Of excellent work! The flashing on side of dormer. Water hit siding and rotted out boards which will be replaced. Gutter rotted out too!
roof0805017.jpg
Large boards at top of my bedroom not like other slip sheet sized boards.
roof0805018.jpg
Nearing the end of work on the 4th day. Fifth day will have interior structual repairs and more roofing. Delay in getting roofing materials deleivered.
roof0805019.jpg
Sight structual damage to trim board.
roof0805020.jpg
Along the edges and further down the tree went thru a couple of pieces.
roof0805021 roof0805022      
roof0805021.jpg
I really like my camera. . .
roof0805022.jpg
Repaired last month. Looks like it needs a little more where poor faux flashing to old roofs covered up old grout between bricks.